PETROM

           
           
           
           

Investment: 9.000.000 Euro
concrete foundations for tanks,metallic structures,truck loading pumps shelter;
- truck loading bays,concrete platforms;
- 4500 sq.m of road platform,12000 sq.m of roads;
- fire fighting foam building;
- fire fighting pump building;
- fire fighting system ring main PEHD;
- oily water system;
- storm water system;
- piping;
- control shafts;
- main steel piping system;